Lexus ES manuals

Lexus ES: On-vehicle Inspection

ON-VEHICLE INSPECTION

PROCEDURE

1. INSPECT CAM TIMING CONTROL MOTOR WITH EDU ASSEMBLY

(a) Check Rotation Direction Signal:

(1) Connect the Techstream to the DLC3.

(2) Turn the power switch on (IG).

(3) Turn the Techstream on.

(4) Enter the following menus: Powertrain / Engine / Data List / VVT-iE Motor Direction Bank1.

Powertrain > Engine > Data List

Tester Display

VVT-iE Motor Direction Bank 1

(5) According to the display on the Techstream, read the Data List.

Specified Condition:

Techstream Display

Condition

Specified Condition

VVT-iE Motor Direction Bank1

Power switch off → Power switch on (IG)

Backward

HINT:

If the result is not as specified, inspect the cam timing control motor with EDU assembly and wire harness.

(b) Check VVT Change Angle:

(1) Connect the Techstream to the DLC3.

(2) Turn the power switch on (IG).

(3) Turn the Techstream on.

(4) Put the engine in Inspection Mode (Maintenance Mode).

Powertrain > Hybrid Control > Utility

Tester Display

Inspection Mode

(5) Start the engine and warm it up until the engine coolant temperature reaches 75°C (167°F) or higher.

(6) Enter the following menus: Powertrain / Engine / Active Test / Control the VVT-iE Opening Angle Bank 1 / Data List / Intake VVT Change Angle Bank 1 and Intake VVT Target Angle Bank 1.

Powertrain > Engine > Active Test

Active Test Display

Control the VVT-iE Opening Angle Bank 1

Data List Display

Intake VVT Change Angle Bank 1

Intake VVT Target Angle Bank 1

(7) Read the Data List while performing the Active Test with the engine idling.

Specified Condition:

Active Test Movement Order

Difference between "Intake VVT Change Angle Bank 1" and "Intake VVT Target Angle Bank 1"

0 deg → 10 deg → 20 deg → 40 deg → 0 deg → 10 deg → END

Within 4 DegFR

HINT:

If the result is not as specified, inspect the cam timing control motor with EDU assembly and camshaft timing gear assembly.

READ NEXT:

 Removal

REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during cam

 Inspection

INSPECTION CAUTION / NOTICE / HINT NOTICE: Make sure the contact surface of the cam timing control motor with EDU assembly (the surface that contacts the No. 2 timing gear cover assembly) is free o

 Installation

INSTALLATION CAUTION / NOTICE / HINT NOTICE: This procedure includes the installation of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts. Click here

SEE MORE:

 Tire And Wheel

ComponentsCOMPONENTS ILLUSTRATION *1 WHEEL ASSEMBLY *2 AXLE HUB NUT Tightening torque for "Major areas involving basic vehicle performance such as moving/turning/stopping": N*m (kgf*cm, ft.*lbf) - -

 Installation

INSTALLATION PROCEDURE 1. INSTALL STARTER ASSEMBLY (a) Install the starter assembly with the 2 bolts. Torque: 46 N·m {469 kgf·cm, 34 ft·lbf} (b) Connect the engine wire to the terminal 30 with the nut. Torque: 9.8 N·m {100 kgf·cm, 87 in·lbf} (c) Close the terminal cap. (d) Connect the starte

© 2016-2024 Copyright www.lexguide.net