Lexus ES manuals

Lexus ES: On-vehicle Inspection

ON-VEHICLE INSPECTION

PROCEDURE

1. INSPECT CAM TIMING CONTROL MOTOR WITH EDU ASSEMBLY

(a) Check Rotation Direction Signal:

(1) Connect the Techstream to the DLC3.

(2) Turn the power switch on (IG).

(3) Turn the Techstream on.

(4) Enter the following menus: Powertrain / Engine / Data List / VVT-iE Motor Direction Bank1.

Powertrain > Engine > Data List

Tester Display

VVT-iE Motor Direction Bank 1

(5) According to the display on the Techstream, read the Data List.

Specified Condition:

Techstream Display

Condition

Specified Condition

VVT-iE Motor Direction Bank1

Power switch off → Power switch on (IG)

Backward

HINT:

If the result is not as specified, inspect the cam timing control motor with EDU assembly and wire harness.

(b) Check VVT Change Angle:

(1) Connect the Techstream to the DLC3.

(2) Turn the power switch on (IG).

(3) Turn the Techstream on.

(4) Put the engine in Inspection Mode (Maintenance Mode).

Powertrain > Hybrid Control > Utility

Tester Display

Inspection Mode

(5) Start the engine and warm it up until the engine coolant temperature reaches 75°C (167°F) or higher.

(6) Enter the following menus: Powertrain / Engine / Active Test / Control the VVT-iE Opening Angle Bank 1 / Data List / Intake VVT Change Angle Bank 1 and Intake VVT Target Angle Bank 1.

Powertrain > Engine > Active Test

Active Test Display

Control the VVT-iE Opening Angle Bank 1

Data List Display

Intake VVT Change Angle Bank 1

Intake VVT Target Angle Bank 1

(7) Read the Data List while performing the Active Test with the engine idling.

Specified Condition:

Active Test Movement Order

Difference between "Intake VVT Change Angle Bank 1" and "Intake VVT Target Angle Bank 1"

0 deg → 10 deg → 20 deg → 40 deg → 0 deg → 10 deg → END

Within 4 DegFR

HINT:

If the result is not as specified, inspect the cam timing control motor with EDU assembly and camshaft timing gear assembly.

READ NEXT:

 Removal

REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during cam

 Inspection

INSPECTION CAUTION / NOTICE / HINT NOTICE: Make sure the contact surface of the cam timing control motor with EDU assembly (the surface that contacts the No. 2 timing gear cover assembly) is free o

 Installation

INSTALLATION CAUTION / NOTICE / HINT NOTICE: This procedure includes the installation of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts. Click here

SEE MORE:

 Data List / Active Test

DATA LIST / ACTIVE TEST DATA LIST HINT: Using the Techstream to read the Data List allows the values or states of switches, sensors, actuators and other items to be read without removing any parts. This non-intrusive inspection can be very useful because intermittent conditions or signals may be dis

 Actuator Supply Voltage "A" Stuck On (P06579E)

MONITOR DESCRIPTION The ECM monitors the output voltage to the throttle actuator. This self-check ensures that the ECM is functioning properly. The output voltage is usually 0 V when the engine switch is turned off. If the output voltage is 7 V or higher when the engine switch is turned off, the ECM

© 2016-2025 Copyright www.lexguide.net