Lexus ES: Components
COMPONENTS
ILLUSTRATION
*1 | CAM TIMING OIL CONTROL SOLENOID ASSEMBLY | *2 | NO. 1 ENGINE COVER SUB-ASSEMBLY |
*3 | O-RING | - | - |
| N*m (kgf*cm, ft.*lbf): Specified torque | ● | Non-reusable part |
★ | Precoated part | - | - |
READ NEXT:
ON-VEHICLE INSPECTION PROCEDURE 1. INSPECT CAM TIMING OIL CONTROL SOLENOID ASSEMBLY (a) Connect the Techstream to the DLC3. (b) Turn the power switch on (IG). (c) Turn the Techstream on. (d) Put the e
REMOVAL CAUTION / NOTICE / HINT NOTICE: This procedure includes the removal of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts. Click here PROCEDURE
INSPECTION PROCEDURE 1. INSPECT CAM TIMING OIL CONTROL SOLENOID ASSEMBLY (a) Check the resistance. (1) Measure the resistance according to the value(s) in the table below. Standard Resistance:
SEE MORE:
INSTALLATION PROCEDURE 1. INSTALL ACCELERATOR PEDAL ASSEMBLY (a) Engage the claw to install the accelerator pedal assembly. (b) Install the 2 bolts. Torque: 7.5 N·m {76 kgf·cm, 66 in·lbf} 2. INSTALL ACCELERATOR PEDAL PAD (a) Engage the 4 claws to install the accelerator pedal pad
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during No. 2 clearance warning buzzer removal/installation are shown below. Necessary Procedure After Parts Re
© 2016-2024 Copyright www.lexguide.net