Lexus ES: Egr Cooler
READ NEXT:
COMPONENTS ILLUSTRATION *1 EGR COOLER ASSEMBLY *2 EGR VALVE GASKET *3 EGR COOLER GASKET *4 NO. 4 WATER BY-PASS HOSE *5 NO. 3 WATER BY-PASS HOSE - - N*m (kgf*cm, ft
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during EGR
INSTALLATION PROCEDURE 1. INSTALL EGR COOLER ASSEMBLY (a) Install a new EGR cooler gasket to the EGR cooler assembly. NOTICE: Make sure that the claws of the EGR cooler gasket are toward the EGR co
SEE MORE:
INSPECTION PROCEDURE 1. INSPECT THROTTLE BODY WITH MOTOR ASSEMBLY (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Condition 5 (M-) - 6 (M+) 20°C (68°F) 0.3 to 100 Ω If the result is not as sp
DATA LIST / ACTIVE TEST ACTIVE TEST HINT: Using the Techstream to perform Active Tests allows relays, VSVs, actuators and other items to be operated without removing any parts. This non-intrusive functional inspection can be very useful because intermittent operation may be discovered before parts o
© 2016-2024 Copyright www.lexguide.net