Lexus ES manuals

Lexus ES: Precaution

PRECAUTION

INITIALIZATION

NOTICE:

Make sure to perform the necessary procedures (adjustment, calibration, initialization, or registration) after parts related to the cable has been disconnected from the negative (-) battery terminal.

Click here

CHARGING SYSTEM PRECAUTION

NOTICE:

  • Check that the battery cables are connected to the correct terminals.
  • Disconnect the battery cables when the battery is given a quick charge.
  • Do not perform tests with a high voltage insulation resistance tester.
  • Never disconnect the battery cables while the engine is running.
  • Check that the charging cable nuts are tightened on terminal B of the generator assembly and on the No. 1 engine room relay block and No. 1 junction block assembly.

READ NEXT:

 Battery

ComponentsCOMPONENTS ILLUSTRATION *1 BATTERY *2 NEGATIVE BATTERY TERMINAL *3 POSITIVE BATTERY TERMINAL *4 NO. 2 BATTERY CLAMP *5 BATTERY TERMINAL CAP *6 BATTERY INSULATO

 Steering

h1 {color:red;} h2 {color:blue;} h3 {color:green;}

 Power Assist Systems

SEE MORE:

 Utility

UTILITY ALL READINESS HINT: With "All Readiness", you can check whether or not the DTC judgment has been completed by using the Techstream. You should check "All Readiness" after simulating malfunction symptoms or for validation after finishing repairs. (a) Connect the Techstream to the DLC3

 Data List / Active Test

DATA LIST / ACTIVE TEST DATA LIST NOTICE: In the table below, the values listed under "Normal Condition" are reference values. Do not depend solely on these reference values when deciding whether a part is faulty or not. HINT: Using the Techstream to read the Data List allows the values or states of

© 2016-2024 Copyright www.lexguide.net