Lexus ES: A25a-fks (battery / Charging)
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL GENERATOR ASSEMBLY (a) Install the generator assembly with the bolt and 2 nuts. Torque: 25 N·m {255 kgf·cm, 18 ft·lbf} (b) Engage the clamp. (c) Connect the E.F.I
REASSEMBLY PROCEDURE 1. INSTALL GENERATOR ROTOR BEARING (a) Using SST and a press, install a new generator rotor bearing. SST: 09950-60011 09951-00470 SST: 09950-70010 09951-07100 (b
SEE MORE:
DESCRIPTION Detection Item Symptom Trouble Area Luggage Door ECU Communication Stop Mode Any of the following conditions are met:
Communication stop for "Back Door" is indicated on the "Communication Bus Check" screen of the Techstream.
Click here
Communication stop history for
DESCRIPTION The main body ECU (multiplex network body ECU) detects a high beam headlight illumination request signal of the automatic high beam system from the forward recognition camera. DTC No. Detection Item DTC Detection Condition Trouble Area DTC Output from B124C Automatic Hig
© 2016-2024 Copyright www.lexguide.net