Lexus ES: Installation
INSTALLATION
PROCEDURE
1. INSTALL GENERATOR ASSEMBLY
(a) Install the generator assembly with the bolt and 2 nuts.
Torque:
25 N·m {255 kgf·cm, 18 ft·lbf}
(b) Engage the clamp.
(c) Connect the E.F.I. vacuum sensor assembly (manifold absolute pressure sensor) connector.
(d) Install the wire harness clamp bracket to the generator assembly with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(e) Connect the wire harness to terminal B with the nut.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(f) Close the terminal cap.
(g) Connect the generator assembly connector.
2. INSTALL V-RIBBED BELT
Click here
3. INSTALL INLET AIR CLEANER ASSEMBLY
Click here
4. INSTALL COOL AIR INTAKE DUCT SEAL
Click here
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Click here
READ NEXT:
REASSEMBLY PROCEDURE 1. INSTALL GENERATOR ROTOR BEARING (a) Using SST and a press, install a new generator rotor bearing. SST: 09950-60011 09951-00470 SST: 09950-70010 09951-07100 (b
INSPECTION PROCEDURE 1. INSPECT GENERATOR BRUSH HOLDER ASSEMBLY (a) Using a vernier caliper, measure the length of the exposed brushes. Standard Exposed Brush Length: 9.5 to 11.5 mm (0.374 to 0.45
DISASSEMBLY PROCEDURE 1. REMOVE GENERATOR PULLEY CAP (a) Remove the generator pulley cap from the generator pulley with clutch. NOTICE:
Do not reuse the generator pulley cap.
If the generato
SEE MORE:
PARTS LOCATION ILLUSTRATION *1 TELEPHONE MICROPHONE ASSEMBLY *2 INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY - ECU-ACC FUSE - ECU-IG1 NO. 4 FUSE - ECU-IG2 NO. 3 FUSE (w/ Manual (SOS) Switch) - PANEL FUSE - ECU-DCC NO. 2 FUSE - METER-IG2 FUSE - ECU-B NO. 2 FUSE - DCM FUSE (w/ Manual (SOS) Switc
CUSTOMIZE PARAMETERS CUSTOMIZE LIGHTING SYSTEM (EXT) NOTICE:
When the customer requests a change in a function, first make sure that the function can be customized.
Be sure to make a note of the current settings before customizing.
When troubleshooting a function, first make sure that the fun
© 2016-2024 Copyright www.lexguide.net