Lexus ES manuals

Lexus ES: On-vehicle Inspection

ON-VEHICLE INSPECTION

PROCEDURE

1. INSPECT CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY

(a) Connect the Techstream to the DLC3.

(b) Start the engine.

(c) Turn the Techstream on.

(d) Inspect the camshaft timing oil control solenoid assembly (for intake side).

(1) Enter the following menus: Powertrain / Engine / Active Test / Control the Intake VVT OCV Duty Ratio Bank 1 or Control the Intake VVT OCV Duty Ratio Bank 2 / Data List / Intake VVT Change Angle Bank 1 or Intake VVT Change Angle Bank 2.

Powertrain > Engine > Active Test

Active Test Display

Control the Intake VVT OCV Duty Ratio Bank 1

Data List Display

Intake VVT Change Angle Bank 1

Powertrain > Engine > Active Test

Active Test Display

Control the Intake VVT OCV Duty Ratio Bank 2

Data List Display

Intake VVT Change Angle Bank 2

(2) Read the Data List while performing the Active Test with the engine idling.

OK:

Techstream Operation

Data List (Intake VVT Change Angle Bank 1 or Intake VVT Change Angle Bank 2)

-100% to 100%

Varies by 70 DegFR or more

If the result is not as specified, check the camshaft timing oil control solenoid assembly, wire harness and ECM.

(e) Inspect the camshaft timing oil control solenoid assembly (for exhaust side).

(1) Enter the following menus: Powertrain / Engine / Active Test / Control the Exhaust VVT OCV Duty Ratio Bank 1 or Control the Exhaust VVT OCV Duty Ratio Bank 2.

Powertrain > Engine > Active Test

Tester Display

Control the Exhaust VVT OCV Duty Ratio Bank 1

Powertrain > Engine > Active Test

Tester Display

Control the Exhaust VVT OCV Duty Ratio Bank 2

(2) Check the engine speed while operating the camshaft timing oil control solenoid assembly (for exhaust camshaft) using the Techstream.

OK:

Techstream Operation

Engine Condition

0%

Normal engine speed

100%

Engine idles roughly or stalls

HINT:

Refer to "Data List / Active Test" [Exhaust VVT OCV Control Duty Ratio Bank 1, Exhaust VVT Change Angle Bank 1, Exhaust VVT OCV Control Duty Ratio Bank 2 and Exhaust VVT Change Angle Bank 2].

Click here

If the result is not as specified, check the camshaft timing oil control solenoid assembly, wire harness and ECM.

READ NEXT:

 Removal

REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during cams

 Inspection

INSPECTION PROCEDURE 1. INSPECT CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY HINT: Use the same procedure for the intake side and exhaust side. (a) Check the resistance. (1) Measure the resistance

 Installation

INSTALLATION PROCEDURE 1. INSTALL CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY (for Intake Side of Bank 2) (a) Apply engine oil to a new O-ring and install it to the camshaft timing oil control so

SEE MORE:

 Hybrid/EV Powertrain Control Module Monitoring Processor Unexpected Operation (P060A94)

DTC SUMMARY MALFUNCTION DESCRIPTION The main CPU and sub CPU of the hybrid vehicle control ECU monitor their internal operation and each other for malfunctions. The cause of this malfunction may be the following: Hybrid vehicle control ECU internal malfunction Hybrid vehicle control ECU malfuncti

 Precaution

PRECAUTION 1.PRECAUTION WHEN REMOVING/INSTALLING INVERTER WITH CONVERTER ASSEMBLY CAUTION: Do not push down or apply excessive force to the inverter with converter assembly. Be careful not to injure yourself on the edges of the inverter with converter assembly when performing work. NOTICE: O

© 2016-2024 Copyright www.lexguide.net