Lexus ES: Oil Pressure Switching Valve
READ NEXT:
COMPONENTS ILLUSTRATION *1 FRONT FENDER APRON SEAL RH *2 OIL PRESSURE CONTROL VALVE ASSEMBLY N*m (kgf*cm, ft.*lbf): Specified torque - -
REMOVAL CAUTION / NOTICE / HINT NOTICE: This procedure includes the removal of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts. Click here PROCEDURE
INSPECTION PROCEDURE 1. INSPECT OIL PRESSURE CONTROL VALVE ASSEMBLY (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition
SEE MORE:
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during ignition coil assembly or spark plug removal/installation are shown below. Necessary Procedures After P
INSTALLATION PROCEDURE 1. INSTALL TRANSFER ASSEMBLY (a) Using SST and a 17 mm union nut wrench, install the transfer assembly to the automatic transaxle assembly with the 8 nuts. SST: 09961-00950 Torque: Specified tightening torque : 68.6 N·m {700 kgf·cm, 51 ft·lbf} HINT:
Calculate the to
© 2016-2024 Copyright www.lexguide.net