Lexus ES: Installation
INSTALLATION
PROCEDURE
1. INSTALL TILT AND TELESCOPIC SWITCH
(a) Engage the claw to install the tilt and telescopic switch.
(b) Connect the tilt and telescopic connector to the tilt and telescopic switch.
(c) Connect the spiral cable connector to the spiral cable sub-assembly.
2. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
for 2GR-FKS: Click here
for A25A-FXS: Click here
for A25A-FKS: Click here
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click here
3. INSTALL LOWER STEERING COLUMN COVER SUB-ASSEMBLY
Click here
4. INSPECT SRS WARNING LIGHT
for Gasoline Model: Click here
for HV Model: Click here
5. CUSTOMIZE POWER TILT AND POWER TELESCOPIC STEERING COLUMN SYSTEM
Click here
READ NEXT:
COMPONENTS ILLUSTRATION *A for A25A-FXS *B for 2GR-FKS *1 FRONT WHEEL OPENING EXTENSION PAD LH *2 FRONT WHEEL OPENING EXTENSION PAD RH *3 NO. 1 ENGINE UNDER COVER *4 NO.
SEE MORE:
DESCRIPTION There may be a short circuit between one of the CAN bus lines and +B when there is no resistance between terminal 15 (CA5H) of the central gateway ECU (network gateway ECU) and terminal 16 (BAT) of the DLC3, or terminal 16 (CA5L) of the central gateway ECU (network gateway ECU) and termi
INSPECTION PROCEDURE 1. INSPECT LUGGAGE DOOR OPENING SWITCH (TRUNK AND FUEL SWITCH ASSEMBLY) (a) Check the switch. (1) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Condition 4 (B) - 3 (L) Pressed (On)
© 2016-2024 Copyright www.lexguide.net