Lexus ES: Installation
INSTALLATION
PROCEDURE
1. INSTALL MASS AIR FLOW METER SUB-ASSEMBLY
HINT:
Perform "Inspection After Repair" after replacing the mass air flow meter sub-assembly.
Click here
(a) Install the mass air flow meter sub-assembly to the air cleaner cap sub-assembly with the 2 screws.
NOTICE:
-
If the mass air flow meter sub-assembly has been struck or dropped, replace it.
-
If reusing the mass air flow meter sub-assembly, be sure to inspect the O-ring.
-
Make sure that the O-ring is not cracked or moved out of place when installing the mass air flow meter sub-assembly.
(b) Connect the mass air flow meter sub-assembly connector.
2. PERFORM INITIALIZATION
(a) Perform "Inspection After Repair" after replacing the mass air flow meter sub-assembly.
Click here
READ NEXT:
On-vehicle InspectionON-VEHICLE INSPECTION PROCEDURE 1. INSPECT MAIN RELAY (EFI-MAIN NO. 1) (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester
PRECAUTION WHEN USING TECHSTREAM CAUTION: Observe the following items for safety reasons:
Before using the Techstream, read the instruction manual.
Prevent the Techstream cable from being caught
SEE MORE:
CAUTION / NOTICE / HINT HINT: *: Use the Techstream. PROCEDURE 1. VEHICLE BROUGHT TO WORKSHOP
NEXT 2. CUSTOMER PROBLEM ANALYSIS (a) Interview the customer and confirm the problem. Click here
NEXT 3. INSPECT AUXILIARY BATTERY VOLTAGE Stan
INSTALLATION PROCEDURE 1. INSTALL FUEL MAIN VALVE ASSEMBLY (a) Apply gasoline to 2 new O-rings. Then install the O-rings to the fuel main valve assembly (for Low Pressure). (b) Apply gasoline to 2 new O-rings. Then install the O-rings to the fuel main valve assembly (for High Pressure). (c) Install
© 2016-2025 Copyright www.lexguide.net
