Lexus ES: Installation
INSTALLATION
CAUTION / NOTICE / HINT
NOTICE:
This procedure includes the installation of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts.
Click here
PROCEDURE
1. INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)
(a) Apply a light coat of engine oil to the O-ring.
NOTICE:
When reusing the PCV valve (ventilation valve sub-assembly), inspect the O-ring.
(b) Install the PCV valve (ventilation valve sub-assembly) to the cylinder head sub-assembly.
2. INSTALL INTAKE MANIFOLD
Click here
READ NEXT:
ComponentsCOMPONENTS ILLUSTRATION *1 PURGE VALVE (PURGE VSV) *2 NO. 1 FUEL VAPOR FEED HOSE *3 NO. 2 FUEL VAPOR FEED HOSE - - N*m (kgf*cm, ft.*lbf): Specified torque - -
ComponentsCOMPONENTS ILLUSTRATION *1 E.F.I. VACUUM SENSOR ASSEMBLY (MANIFOLD ABSOLUTE PRESSURE SENSOR) *2 VACUUM HOSE N*m (kgf*cm, ft.*lbf): Specified torque - - RemovalREMOV
SEE MORE:
INSTALLATION PROCEDURE 1. INSTALL GENERATOR ASSEMBLY (a) Install the generator assembly with the bolt and 2 nuts. Torque: 25 N·m {255 kgf·cm, 18 ft·lbf} (b) Engage the clamp. (c) Connect the E.F.I. vacuum sensor assembly (manifold absolute pressure sensor) connector. (d) Install the wire harness
INSPECTION PROCEDURE 1. INSPECT LUGGAGE DOOR OPENING CANCEL SWITCH ASSEMBLY (a) Check the resistance. (1) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Switch Condition Specified Condition 2 (B) - 1 (L) Switch on Below
© 2016-2024 Copyright www.lexguide.net