Lexus ES manuals

Lexus ES: Installation

INSTALLATION

PROCEDURE

1. INSTALL VACUUM SWITCHING VALVE (for Active Control Engine Mount System)

(a) Install the vacuum switching valve (for active control engine mount system) to the front engine mounting insulator with the nut.

Torque:

6.0 N·m {61 kgf·cm, 53 in·lbf}

(b) Connect the 3 vacuum hoses to the vacuum switching valve (for active control engine mount system).

(c) Engage the wire harness clamp and connect the vacuum switching valve (for active control engine mount system) connector.

(d) Install the 2 bolts.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

(e) Engage the wire harness clamp and install the engine wire with the bolt.

Torque:

8.0 N·m {82 kgf·cm, 71 in·lbf}

2. INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE

Click here

3. INSTALL INLET AIR CLEANER ASSEMBLY

Click here

4. INSTALL COOL AIR INTAKE DUCT SEAL

Click here

READ NEXT:

 2gr-fks (engine Mechanical)

 Camshaft

 Components

COMPONENTS ILLUSTRATION *1 VENTILATION HOSE *2 PURGE VALVE (PURGE VSV) *3 NO. 1 FUEL VAPOR FEED HOSE *4 NO. 2 SURGE TANK STAY *5 INTAKE AIR SURGE TANK ASSEMBLY *6 AIR SUR

SEE MORE:

 How To Proceed With Troubleshooting

CAUTION / NOTICE / HINT HINT: Use the following procedure to troubleshoot the parking support brake system. *: Use the Techstream. PROCEDURE 1. VEHICLE BROUGHT TO WORKSHOP NEXT 2. CUSTOMER PROBLEM ANALYSIS NEXT 3. INSPECT BATTERY VOLT

 Removal

REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during hybrid vehicle control ECU removal/installation are shown below. Necessary Procedures After Parts Remov

© 2016-2024 Copyright www.lexguide.net