Lexus ES: Inspection
INSPECTION
PROCEDURE
1. INSPECT FUEL VAPOR CONTAINMENT VALVE (FUEL TANK SOLENOID MAIN VALVE ASSEMBLY)
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection | Condition | Specified Condition |
1 - 2 | 20°C (68°F) | 25 to 30 Ω |
If the result is not as specified, replace the fuel vapor containment valve (fuel tank solenoid main valve assembly).
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL FUEL VAPOR CONTAINMENT VALVE (FUEL TANK SOLENOID MAIN VALVE ASSEMBLY) (a) Install the fuel vapor containment valve (fuel tank solenoid main valve assembly) to the veh
COMPONENTS ILLUSTRATION *1 PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY) - -
SEE MORE:
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during kick door control sensor removal/installation are shown below. Necessary Procedure After Parts Removed/
DESCRIPTION The blind spot monitor sensor receives vehicle speed signals from the skid control ECU via CAN communication. Blind Spot Monitor Master DTC No. Detection Item DTC Detection Condition Trouble Area C1A45 Vehicle Speed Sensor A fail flag is transmitted from the skid control
© 2016-2025 Copyright www.lexguide.net
