Lexus ES: Removal
REMOVAL
PROCEDURE
1. REMOVE INSTRUMENT PANEL FINISH PANEL END LH
Click here
2. REMOVE INSTRUMENT PANEL FINISH PANEL END RH
Click here
3. REMOVE CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
Click here
4. REMOVE SHIFT LEVER KNOB SUB-ASSEMBLY
for UA80E:
Click here
for P710:
Click here
for UB80F:
Click here
5. REMOVE REAR UPPER CONSOLE PANEL SUB-ASSEMBLY
Click here
6. REMOVE REMOTE OPERATION CONTROLLER ASSEMBLY
(a) Remove the 4 screws and remote operation controller assembly as shown in the illustration.
| Remove in this Direction |
READ NEXT:
ADJUSTMENT PROCEDURE 1. PERFORM BLIND SPOT MONITOR BEAM AXIS CONFIRMATION HINT: The blind spot monitor beam axis confirmation is performed to confirm whether the sensor's beam axis is correct, and per
SEE MORE:
PRECAUTION PRECAUTION FOR DISCONNECTING CABLE FROM NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable from the negative (-) battery terminal, initialize the following systems after the cable is reconnected. System Name See Procedure Lane Control System (for Gasoline Model)
ON-VEHICLE INSPECTION CAUTION / NOTICE / HINT CAUTION:
To prevent burns, do not touch the engine, exhaust manifold or other high temperature components while the engine is hot.
To prevent burns, do not remove the oil pressure and temperature sensor while the engine is hot. PROCEDURE 1. INS
© 2016-2024 Copyright www.lexguide.net