Lexus ES: Operation Check
OPERATION CHECK
CHECK WINDSHIELD DEICER SYSTEM
(a) Turn the power switch on (IG).
(b) Check that the windshield deicer wire (windshield glass) becomes warm by operating the front wiper deicer switch.
(c) Confirm that windshield deicer system operation stops after approximately 15 minutes.
NOTICE:
If the auxiliary battery voltage becomes low, auxiliary battery load control will operate in order to ensure sufficient power is supplied to the power steering system. In this case, the windshield deicer system may not operate.
READ NEXT:
PROBLEM SYMPTOMS TABLE NOTICE:
If the auxiliary battery voltage becomes low, auxiliary battery load control will operate in order to ensure sufficient power is supplied to the power steering system
TERMINALS OF ECU CHECK AIR CONDITIONING AMPLIFIER ASSEMBLY *A w/o Seat Heater *B w/ Seat Heater (a) Disconnect the G39 air conditioning amplifier assembly connector. (b) Measure the volta
DIAGNOSIS SYSTEM CHECK DLC3 (a) Check the DLC3. Click here INSPECT AUXILIARY BATTERY VOLTAGE (a) Measure the auxiliary battery voltage with the power switch off. Standard Voltage: 11 to 14 V If the
SEE MORE:
MONITOR DESCRIPTION The ECM monitors the input signals of the No. 1 accelerator pedal position sensor. If the input signals and control signals deviate, this DTC is stored. DTC No. Detection Item DTC Detection Condition Trouble Area MIL Memory Note P060D49 Internal Control Modul
TERMINALS OF ECU HEATED STEERING WHEEL CONTROLLER (STEERING VIBRATION ECU) (a) Measure the voltage or resistance according to the value(s) in the table below. HINT: Perform the inspection from the harness side with the connectors connected. Terminal No. (Symbol) Terminal Description Conditio
© 2016-2024 Copyright www.lexguide.net