Lexus ES: Operation Check
OPERATION CHECK
CHECK WINDSHIELD DEICER SYSTEM
(a) Turn the power switch on (IG).
(b) Check that the windshield deicer wire (windshield glass) becomes warm by operating the front wiper deicer switch.
(c) Confirm that windshield deicer system operation stops after approximately 15 minutes.
NOTICE:
If the auxiliary battery voltage becomes low, auxiliary battery load control will operate in order to ensure sufficient power is supplied to the power steering system. In this case, the windshield deicer system may not operate.
READ NEXT:
PROBLEM SYMPTOMS TABLE NOTICE:
If the auxiliary battery voltage becomes low, auxiliary battery load control will operate in order to ensure sufficient power is supplied to the power steering system
TERMINALS OF ECU CHECK AIR CONDITIONING AMPLIFIER ASSEMBLY *A w/o Seat Heater *B w/ Seat Heater (a) Disconnect the G39 air conditioning amplifier assembly connector. (b) Measure the volta
DIAGNOSIS SYSTEM CHECK DLC3 (a) Check the DLC3. Click here INSPECT AUXILIARY BATTERY VOLTAGE (a) Measure the auxiliary battery voltage with the power switch off. Standard Voltage: 11 to 14 V If the
SEE MORE:
REASSEMBLY PROCEDURE 1. INSTALL SPARK PLUG TUBE HINT: When using a new cylinder head sub-assembly, the spark plug tubes must be replaced. (a) Apply adhesive to a new spark plug tube as shown in the illustration. Adhesive: Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent Standard Appli
INSPECTION PROCEDURE 1. INSPECT REAR COMBINATION LIGHT LENS AND BODY LH (for TMC Made) *a Component without harness connected (Rear Combination Light Lens and Body LH) (a) Apply auxiliary battery voltage to the rear combination light lens and body LH and check that the lights illuminate. OK
© 2016-2024 Copyright www.lexguide.net