Lexus ES: Installation
INSTALLATION
CAUTION / NOTICE / HINT
HINT:
-
Use the same procedure for the RH side and LH side.
-
The following procedure is for the LH side.
PROCEDURE
1. INSTALL REAR DOOR ILLUMINATION LIGHT (REAR DOOR OUTSIDE HANDLE ASSEMBLY)
Click here
2. INSTALL REAR DOOR SERVICE HOLE COVER
Click here
3. INSTALL REAR DOOR TRIM BOARD SUB-ASSEMBLY
Click here
4. INSTALL COURTESY LIGHT ASSEMBLY
Click here
5. INSTALL REAR DOOR TRIM UPPER PAD
Click here
6. INSTALL REAR POWER WINDOW REGULATOR SWITCH ASSEMBLY WITH REAR DOOR UPPER ARMREST BASE PANEL
Click here
7. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
for 2GR-FKS:
Click here
for A25A-FXS:
Click here
for A25A-FKS:
Click here
8. INSPECT POWER WINDOW OPERATION
for HV Model:
Click here
for Gasoline Model:
Click here
READ NEXT:
ComponentsCOMPONENTS ILLUSTRATION *1 LICENSE PLATE LIGHT ASSEMBLY - - RemovalREMOVAL CAUTION / NOTICE / HINT HINT:
Use the same procedure for the RH side and LH side.
The following
PRECAUTION PRECAUTION FOR DISCONNECTING CABLE FROM NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable from the negative (-) battery terminal, initialize the following systems after the cab
SEE MORE:
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during engine coolant temperature sensor removal/installation are shown below. Necessary Procedures After Part
DESCRIPTION The headlight ECU sub-assembly operates using the power source voltage input from the IG terminal and ECUB terminal. The IG terminal power source voltage is supplied by turning the IG1-NO. 1 relay to ON. The headlight ECU sub-assembly receives power switch on (IG) signals from the main b
© 2016-2024 Copyright www.lexguide.net