INSTALLATION
PROCEDURE
1. INSTALL VACUUM SWITCHING VALVE (for Active Control Engine Mount System)
(a) Install the vacuum switching valve (for active control engine mount system) to the front engine mounting insulator with the nut.
Torque:
6.0 N·m {61 kgf·cm, 53 in·lbf}
(b) Connect the 3 vacuum hoses to the vacuum switching valve (for active control engine mount system).
(c) Engage the wire harness clamp and connect the vacuum switching valve (for active control engine mount system) connector.
(d) Install the wire harness clamp bracket to the transmission case side cover with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(e) Engage the 2 wire harness clamps and install the engine wire with the bolt.
Torque:
8.0 N·m {82 kgf·cm, 71 in·lbf}
2. INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE
Click here
3. INSTALL INLET AIR CLEANER ASSEMBLY
Click here
4. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
Click here
5. INSTALL COOL AIR INTAKE DUCT SEAL
Click here