Lexus ES: Inspection
INSPECTION
PROCEDURE
1. INSPECT FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY)
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection | Condition | Specified Condition |
1 - 2 | 20°C (68°F) | 22 to 28 Ω |
If the result is not as specified, replace the flow shutting valve (water by-pass hose assembly).
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY) (a) Connect the flow shutting valve (water by-pass hose assembly) to the transmission oil cooler and slide the clip
COMPONENTS ILLUSTRATION *1 FRONT WHEEL OPENING EXTENSION PAD LH *2 FRONT WHEEL OPENING EXTENSION PAD RH *3 NO. 1 ENGINE UNDER COVER *4 NO. 2 ENGINE UNDER COVER ASSEMBLY N*m
SEE MORE:
COMPONENTS ILLUSTRATION *1 IGNITION COIL ASSEMBLY *2 ENGINE WIRE *3 CAM TIMING OIL CONTROL SOLENOID ASSEMBLY *4 CAM TIMING CONTROL MOTOR WITH EDU ASSEMBLY *5 CYLINDER HEAD COVER SUB-ASSEMBLY *6 SPARK PLUG TUBE GASKET *7 CAMSHAFT POSITION SENSOR (for Intake Side)
DESCRIPTION When the mirror heater switch (rear window defogger switch) is operated, the mirror heater signal is sent to the air conditioning amplifier assembly and then to each outer mirror control ECU assembly via CAN communication. Based on this signal, the outer mirror control ECU assemblies ope
© 2016-2024 Copyright www.lexguide.net