Lexus ES manuals

Lexus ES: Inspection

INSPECTION

PROCEDURE

1. INSPECT OIL PUMP RELIEF VALVE

(a) Coat the oil pump relief valve with engine oil and check that it falls smoothly into the valve hole by its own weight.

HINT:

If the oil pump relief valve does not fall smoothly, replace the timing chain cover assembly.

2. INSPECT OIL PUMP ROTOR SET

(a) Apply engine oil to the drive rotor and driven rotor.

(b) Install the drive rotor and driven rotor to the timing chain cover assembly with the rotor marks facing up. Check that the rotors rotate smoothly.

HINT:

If the rotors do not rotate smoothly, replace the timing chain cover assembly.

*a

Rotor Mark

(c) Check the tip clearance.

(1) Using a feeler gauge, measure the clearance between the drive rotor and driven rotor tips as shown in the illustration.

Standard Tip Clearance:

0.040 to 0.150 mm (0.00157 to 0.00591 in.)

Maximum Tip Clearance:

0.150 mm (0.00591 in.)

HINT:

If the tip clearance is more than the maximum, replace the timing chain cover assembly.

*a

Feeler Gauge

(d) Check the side clearance.

(1) Using a feeler gauge and precision straightedge, measure the clearance between the drive rotor and driven rotor and precision straightedge as shown in the illustration.

Standard Side Clearance:

0.030 to 0.070 mm (0.00118 to 0.00276 in.)

Maximum Side Clearance:

0.070 mm (0.00276 in.)

HINT:

If the side clearance is more than the maximum, replace the timing chain cover assembly.

*a

Precision Straightedge

*b

Feeler Gauge

(e) Check the body clearance.

(1) Using a feeler gauge, measure the clearance between the timing chain cover assembly and driven rotor as shown in the illustration.

Standard Body Clearance:

0.250 to 0.325 mm (0.00984 to 0.0128 in.)

Maximum Body Clearance:

0.325 mm (0.0128 in.)

HINT:

If the body clearance is more than the maximum, replace the timing chain cover assembly.

*a

Feeler Gauge

READ NEXT:

 Reassembly

REASSEMBLY PROCEDURE 1. INSTALL OIL PUMP ROTOR SET (a) Coat the drive rotor and driven rotor with engine oil and place them into the timing chain cover assembly with the rotor marks facing up. Chec

 Installation

INSTALLATION PROCEDURE 1. INSTALL TIMING CHAIN COVER ASSEMBLY (a) Clean the contact surfaces of the engine assembly, and confirm that no oil, moisture, or other foreign matter is on the surfaces.

 2gr-fks (starting)

SEE MORE:

 Diagnostic Trouble Code Chart

DIAGNOSTIC TROUBLE CODE CHART Power Trunk Lid System DTC No. Detection Item Link B2205 Kick Sensor Circuit B2222 PBD/PTL Pulse Sensor B2225 PBD/PTL Motor Clutch Malfunction B2250 PBD/PTL Closer Operation B2251 PBD/PTL Closer Switch U0

 A25a-fks Battery

Components COMPONENTS ILLUSTRATION *1 BATTERY *2 NEGATIVE BATTERY TERMINAL *3 POSITIVE BATTERY TERMINAL *4 NO. 2 BATTERY CLAMP *5 BATTERY TERMINAL CAP *6

© 2016-2025 Copyright www.lexguide.net